Solutions
Battery budget for a sub-GHz sensor: a 10-year example
A 2.4 Ah cell over a decade allows 24.6 µA. Price the burst, the ACK window and the quiescent floor before the ten-year claim goes on a datasheet.
A "ten-year battery" on a sub-GHz sensor datasheet is not a chemistry claim. It is a single number: the current the product is allowed to draw on average. Take a 2.4 Ah AA lithium thionyl chloride cell, derate the usable capacity to 90 % for the 3.0 V cut-off, and divide by a decade of hours. 2,160 mAh over 87,600 hours is 24.6 µA. Every design decision after that is bookkeeping against 24.6 µA, and most field failures I have seen are the bookkeeping being wrong by a factor of three, not the cell being bad.
This is a worked example, done end to end on a real module. All radio numbers come from the TP2503-M1 specification; the duty cycle, quiescent currents and cell are stated assumptions, and the arithmetic is in the last section so you can re-run it with your own numbers.
Why the average current decides everything, and why per-report energy misleads
Suppliers quote energy per transmission because it looks small: 10.4 mJ, a blink. But a device that reports every fifteen minutes sends 96 times a day, and the states between transmissions run for hours. Two clocks matter and they behave differently:
- Episodic loads (transmit, receive window, MCU wake) scale with the number of reports. Their cost is an energy, in µAh per report.
- Continuous loads (cell divider, regulator quiescent current, sleep leakage, RTC) scale with time. Their cost is a current, in µA, all day.
Adding them requires one conversion: a continuous 1 µA for a year is 8.766 mAh. So a 24.6 µA budget is 216 mAh per year, and a reporting cycle that costs 3.4 µAh costs 0.12 % of a day's allowance at 15-minute spacing but 1.4 % at one-minute spacing. That asymmetry is why the interval, not the transmit power, moves the answer.
Step 1: price one reporting cycle from the datasheet
The TP2503-M1 specification gives transmit current ≤130 mA at 3.3 V, receive current ≤30 mA, a 19.2 kbps symbol rate and 17 dBm output. Airtime follows from those, with the frame structure as an assumption:
Phase | Duration | Basis |
|---|---|---|
Wake, PLL settle | 3 ms | assumption |
Preamble | 8 ms | assumption, 8 ms preamble |
Payload, 32 bytes | 13.3 ms | 32 B × 8 / 19.2 kbps |
Burst total | 24.3 ms | sum of the above |
Downlink / ACK window | 300 ms | assumption, MAC dependent |
MCU awake, sample and format | 80 ms | assumption, 3 mA core |
Energy per state is current × time, with 1 mA for 1 s equal to 1/3.6 µAh:
- Transmit: 130 mA × 24.3 ms → 0.88 µAh
- Receive window: 30 mA × 300 ms → 2.50 µAh
- MCU awake: 3 mA × 80 ms → 0.07 µAh
- Per report: 3.45 µAh
Look at the ratio before moving on. The 300 ms listening window costs 2.8 times the transmit burst, and 72.6 % of the whole reporting cycle. The radio's power amplifier is the part engineers tune, and it is the cheap part.
Step 2: the static floor nobody puts in the proposal
The board draws current while nothing is happening. These are the numbers I use as defaults, and each one is a measurement you can make with a µA meter on a prototype:
Contributor | Typical | Why it is there |
|---|---|---|
Cell-sense divider, 2 × 1 MΩ | 1.8 µA | battery voltage telemetry |
Module deep sleep | 2.0 µA | keeps the radio's register state |
MCU stop2 with RTC running | 1.5 µA | wake timer |
LDO quiescent current | 1.0 µA | 3.3 V rail from a 3.6 V cell |
PCB leakage, capacitor leakage | 0.5 µA | humidity, flux residue, output caps |
Total | 6.8 µA | 163 µAh per day |
6.8 µA is 27.6 % of the entire ten-year budget, spent before a single packet leaves the antenna. It is also the number that varies most between designs: measured platform-level sleep currents in published agricultural deployments ranged from 59.6 nA on an STM32WL board to 104 µA on an Arduino MKR WAN 1310, a factor of 1745 for the same job (arXiv:2609.14732). A board idling at 104 µA cannot reach ten years on any AA cell — the capacity caps it at 2.3 years, and no firmware change fixes it.

The figure above is the whole design in one picture: at 96 reports per day the five static lines total 6.8 µA, the reporting cycles add 13.8 µA, and the sum lands at 20.6 µA against a 24.6 µA budget. Three quarters of the allowance is gone before you look at the radio.
Step 3: sweep the interval, and watch the ranking change
With the per-report energy fixed at 3.45 µAh, average current is I = I_static + E_report × N / 24, where N is reports per day. Lifetime follows from capacity with 1 %/yr self-discharge modelled as a decaying capacity, C(t) = C0 × 0.99^t, which is why the curves flatten instead of going to infinity.
Interval | Reports/day | Average current | AA, 2.4 Ah | 1/2 AA, 1.2 Ah |
|---|---|---|---|---|
1 min | 1440 | 213.5 µA | 1.1 yr | 0.6 yr |
5 min | 288 | 48.1 µA | 4.9 yr | 2.5 yr |
10 min | 144 | 27.5 µA | 8.3 yr | 4.3 yr |
15 min | 96 | 20.6 µA | 10.7 yr | 5.7 yr |
30 min | 48 | 13.7 µA | 15.4 yr | 8.3 yr |
60 min | 24 | 10.3 µA | 19.7 yr | 10.8 yr |

The dashed curves are the same firmware with the downlink window removed — unconfirmed uplinks, no ACK listen. At five-minute spacing that single change moves an AA design from 4.9 to 12.0 years. Nothing else in this article buys 2.4× for free. If your application can tolerate fire-and-forget reporting with the network deduplicating on the server side, take it.
The interval sweep also answers a question that comes up in every quotation discussion: going from fifteen minutes to ten costs 3.3 years of life on an AA cell, and from ten to five costs another 3.4. Reporting frequency is the most expensive feature in the product, and it is usually set by a marketing requirement rather than by what the meter actually needs.
The module you can run from a battery, and the one you cannot
Charge per burst, not current, is the sizing number for a primary cell, because a lithium thionyl chloride cell is limited by how much charge it can hand over in a few milliseconds. 130 mA for 24.3 ms is 3.16 mC. Compare the two modules on the same duty cycle:
Supply | 3.1–3.6 V, 3.3 V typical | 5.0–6.0 V, 5.5 V typical |
Transmit current | ≤130 mA @ 3.3 V | 1900 mA @ 5.5 V |
Charge per 24.3 ms burst | 3.16 mC | 46.2 mC |
Capacitance for 300 mV droop | 10–22 mF | 154 mF |
Verdict | single AA cell, plausible | boost converter plus supercap, or mains |
A 1.9 A burst cannot come from a 1/2 AA cell at any temperature; the cell's own impedance collapses first. The MP36 is a legitimate module for a vehicle or a DIN-rail supply, and it belongs in a different product than a battery-powered meter. Sorting the catalogue by transmit current before sorting by sensitivity saves a redesign later — the product overview lists the specs side by side.
Pulse support: why 470 µF is not enough
Engineers routinely put 470 µF across the cell, see it work on the bench at 25 °C, and ship. The arithmetic says it cannot work: a capacitor droop is ΔV = I × t / C, and 3.16 mC into 470 µF is 6.7 V, seven times the rail. The capacitor is not holding the rail; the cell is, and the cell is the component that changes with temperature, age and storage.
Capacitance | Droop at 130 mA (cell idle) | Droop if cell supplies 60 mA | Leakage, rule of thumb |
|---|---|---|---|
470 µF | 6.7 V | 3.6 V | <0.1 µA |
1 mF | 3.2 V | 1.7 V | <0.1 µA |
4.7 mF | 673 mV | 362 mV | ~0.2 µA |
10 mF | 316 mV | 170 mV | ~0.5 µA |
22 mF | 144 mV | 77 mV | ~1.1 µA |
47 mF | 67 mV | 36 mV | ~2.4 µA |
100 mF | 32 mV | 17 mV | ~5 µA |
470 mF | 6.7 mV | 3.6 mV | ~23 µA |

The trade-off is visible in the two directions of that table: below 10 mF the droop eats the rail margin, above 100 mF the leakage eats the battery budget. A 22 mF low-leakage tantalum at roughly 1 µA costs 4 % of the ten-year budget and buys 144 mV of margin; a 0.1 F supercap costs 5 µA, which is 20 % of the budget and more than the transmit energy at one report per hour. If nothing else in this article is remembered: the part you add to survive the pulse can be the reason the product does not last.
Two more terms belong in the same sum. Capacitor and wiring ESR adds I × ESR — 130 mV per ohm at the peak, so a cheap electrolytic with 2 Ω ESR spends 260 mV before the capacitance term is even counted. And the cell itself is not a resistor: the lithium anode of a thionyl chloride cell grows a passivating chloride film while it sits on the shelf, and that film is what the first pulses after a cold night meet. Storage time and temperature are therefore part of the electrical design, not just the logistics. Verify at −20 °C, on a cell that has been on the shelf for a month, or you have verified the bench.
Four ways a ten-year design dies in year two
Symptom in the field | Root cause | What to measure | Fix |
|---|---|---|---|
Resets on the first transmission after a cold night | Cell impedance plus passivation, droop below the 2.5 V brown-out | Burst voltage on a scope at −20 °C with an aged cell | 22–47 mF low-leakage cap, pulse-rated cell, stagger retries |
Life comes out at 4 years, not 10 | ACK window or retry storm: two retries drop the AA case from 10.7 to 9.3 years, a 1 s window to 5.3 | Retry counters on the network side, RX window length in firmware | Shorter window, unconfirmed uplinks where the payload is repeatable |
Quiescent current is 30 µA, not 7 | 100 kΩ divider (36 µA alone), LED, LDO with 5 µA Iq | µA meter in series for 24 h, board by board | 1 MΩ divider switched by a FET, low-Iq regulator, no indicator LED |
Capacity gone at 3.0 V, cell bulging | Deep discharge past the cut-off, or a 1/2 AA cell pushed at 5-minute duty | Cut-off voltage, discharge log | 3.0 V cut-off in firmware, size the cell for the interval actually shipped |
The third row deserves emphasis because it is invisible in a bench test with a bench supply: a divider that burns 36 µA turns a 10-year design into a 4.3-year design, and the fix costs one MOSFET and a firmware line.
What to measure before you promise the number
Five measurements, in this order, on a prototype rather than a spreadsheet:
- Quiescent current over a full day. Series µA meter or a coulomb counter, with the radio connected and the firmware in its shipped sleep state. Compare against the 6.8 µA default in this article; every µA is 0.4 years on an AA cell at this duty cycle.
- The burst, as charge. Put a 0.1 Ω shunt in the cell return and integrate the current trace. You are checking 3.16 mC, not 130 mA: a slower ramp with the same peak can carry twice the charge.
- Droop at the temperature you will ship. Cold box, aged cell, worst-case payload. Watch the rail at the module pins, not at the capacitor.
- Retry count from the gateway side. Radio failures cost energy twice — the retry and the window around it. The retry behaviour of a network under load is covered in the gateway capacity tables piece; a network at 30 s polling tolerates retries that a 4 s network does not.
- Thirty days of coulomb counting against the model. Extrapolate with self-discharge included. If the measured slope is 20 % above the model, do not average the two — find the extra current.
The model itself is eight lines, and it reproduces every number above:
V, I_TX, I_RX = 3.3, 130.0, 30.0 # mA, TP2503-M1
t_tx = (3 + 8 + 32 * 8 / 19.2) / 1000 # 24.3 ms airtime
e = lambda i, t: i * t / 3.6 # uAh
e_rpt = e(I_TX, t_tx) + e(I_RX, 0.30) + e(3, 0.08) # 3.45 uAh
static = 1.8 + 2.0 + 1.5 + 1.0 + 0.5 # 6.8 uA
i_avg = static + e_rpt * (1440 / 15) / 24 # 20.6 uA at 15 min
print(i_avg, 2400 * 0.9 / (i_avg * 8.766)) # 20.6, 10.7 yearsAn independent cross-check, from a different radio and a different research group: a 230 mAh coin cell running a 50-minute notification period came out at 2.5 years on a radio-only energy model (arXiv:2408.04908). This article's model, with a full-system 6.8 µA floor on a 220 mAh cell at one hour, gives 1.9 years. The gap is exactly the quiescent floor and the receive windows, which is the point of the exercise — radio-only models flatter the design by two to three times.
FAQ
Does lowering transmit power extend battery life?
Barely. Dropping from 17 dBm to an assumed 10 dBm and 55 mA cuts the burst energy from 0.88 to 0.37 µAh, which is 2.0 µA of average current at 15-minute reporting — the AA case moves from 10.7 to 11.8 years. That is not nothing, but halving the receive window from 300 to 150 ms moves the same design to 13.8 years, and removing it entirely moves it to 19.2. Spend the optimisation budget on the listening schedule and on the quiescent floor, not on the PA.
Can this run on a CR2032?
Not this module, and usually not this duty cycle. A 220 mAh coin cell at 15-minute reporting lands near one year, and its pulse capability is a few tens of milliamps — 130 mA requires a large buffer capacitor and still leaves the cell in a high-impedance state afterwards. Coin cells fit hourly reporting of a small payload, or a design where the radio is a wake-on-radio receiver with a genuinely tiny duty cycle.
Is a 300 ms receive window realistic?
It depends entirely on the MAC. A window sized for a 19.2 kbps ACK plus guard time is 100–300 ms; a window that waits for a network-side response can be a second or more. At 1 s, per-report energy rises from 3.45 to 9.28 µAh and the AA design falls from 10.7 to 5.3 years. Write the window length down next to the battery claim; it is the second most expensive number in the product after the interval.
What about a solar cell or a supercap instead of a primary cell?
Both change the failure mode rather than removing it. A supercap buffers pulses well and leaks 5–20 µA, which at this duty cycle is a fifth of the budget; a small solar panel can cover 6.8 µA of standby in most climates but not a week of snow cover, so the primary cell stays in the design as a fallback. For sealed, inaccessible installations the honest answer is still a sized primary cell, a 22 mF buffer, and a measured quiescent floor.
If the numbers in this example do not fit your enclosure, the constraint to move is the cell size or the interval — not the transmit power. Start from the module specifications, build the eight-line model with your own duty cycle, and send us the duty cycle if you want the arithmetic checked against a specific module.



